Multifamily Electrical, Solar work permitted April 2, 2025, with 3 permits through April 25, 2025.
THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A 8.61KW DC RATED GRID-TIED PHOTOVOLTAIC SYSTEM. THE INSTALLATION CONSISTS OF A RAILED, ROOF MOUNTED SOLAR ARRAY, INVERTERS AND RELATED ELECTRICAL METERING AND SAFTY EQUIPMENT WILL BE INSTALLED AS REQUIRED BY APPLICABLE CODES AND THE LOCAL UTILITY COMPANY. DURING DAYLIGHT HOURS, THIS PV SYSTEM (SOLAR ELECTRIC) WILL PROVIDE ELECTRICITY IN PARALLEL WITH THE LOCAL UTILITY SERVICE PROVIDER.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Apr 2 – Apr 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SOL2501768 CONSTRUCTION · SOLAR SYSTEM THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A 8.61KW DC RATED GRID-TIED PHOTOVOLTAIC SYSTEM. THE INSTALLATION CONSISTS OF A RAILED, ROOF MOUNTED SOLAR ARRAY, INVERTERS AND RELATED ELECTRICAL METERING AND SAFTY EQUIPMENT WILL BE INSTALLED AS REQUIRED BY APPLICABLE CODES AND THE LOCAL UTILITY… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#E2507907 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#E2507009 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |