Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Hvac/Mechanical, Plumbing, Solar work permitted May 6, 2025, with 8 permits through May 21, 2026.
THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A 6.6 KW DC RATED GRID-TIED PHOTOVOLTAIC SYSTEM. THE INSTALLATION CONSISTS OF A RAILED, ROOF MOUNTED SOLAR ARRAY, INVERTERS AND RELATED ELECTRICAL METERING AND SAFTY EQUIPMENT WILL BE INSTALLED AS REQUIRED BY APPLICABLE CODES AND THE LOCAL UTILITY COMPANY. DURING DAYLIGHT HOURS, THIS PV SYSTEM (SOLAR ELECTRIC) WILL PROVIDE ELECTRICITY IN PARALLEL WITH THE LOCAL UTILITY SERVICE PROVIDER.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
8 permits issued May 6 – May 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#E2609023
SUPPLEMENTAL · ELECTRICAL
Status: Completed
| Not published |
| — |
#E2513657 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2511137 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2511091 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#M2505001 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#BH2410275 CONSTRUCTION · SPECIAL BUILDING - HISTORIC PROPERTY Existing dwelling constructed after 1978. Exterior renovations: Replacement of vinyl siding, windows, doors, roof, gutters, downspouts, light fixtures. Repair damaged trim if necessary. Paint trim. Interior renovations Replacement of HVAC furnace & condensing unit, kitchen & bath plumbing fixtures… Status: Permit Issued | Not published | — |
#E2508446 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#SOL2501137 CONSTRUCTION · SOLAR SYSTEM THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A 6.6 KW DC RATED GRID-TIED PHOTOVOLTAIC SYSTEM. THE INSTALLATION CONSISTS OF A RAILED, ROOF MOUNTED SOLAR ARRAY, INVERTERS AND RELATED ELECTRICAL METERING AND SAFTY EQUIPMENT WILL BE INSTALLED AS REQUIRED BY APPLICABLE CODES AND THE LOCAL UTILITY… Status: Permit Issued | Not published | — |