Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical work permitted May 28, 2025, with 3 permits through September 23, 2025.
REVIEW OF EXISTING PERMIT B2505292:- The location of the bathrooms on all three floors will bechanged, as will the location of utility equipment, such asHVAC, W/C, and W/D. (Everything has already been built; weonly need to update the floor plan).
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued May 28 – Sep 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2509539 CONSTRUCTION · ALTERATION AND REPAIR REVIEW OF EXISTING PERMIT B2505292:- The location of the bathrooms on all three floors will bechanged, as will the location of utility equipment, such asHVAC, W/C, and W/D. (Everything has already been built; weonly need to update the floor plan). Status: Permit Issued | Not published | — |
Commercial and multifamily, biggest first.
#E2511045 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2505292 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR WORK, REPLACE 15 SHEETS OF DRYWALL, 40LIGHTS, PAINT, KITCHEN AND BATHS COMPONETS ANDAND REMOVE WALLS THAT ARE NOT BEARING.no mechanical, plumbing work will be done Status: Permit Issued | Not published | — |