Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building work permitted April 10, 2025, with 2 permits through January 29, 2026.
In the Strivers' Section Historic District CONDO BUILDING TO HAVE REPLACEMENT FRONT STOOP AND THRESHOLD.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Apr 10 – Jan 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2602481 CONSTRUCTION · ALTERATION AND REPAIR In the Strivers' Section Historic District CONDO BUILDING TO HAVE REPLACEMENT FRONT STOOP AND THRESHOLD. Status: Permit Issued | Not published | — | |
#B2500988 CONSTRUCTION · ALTERATION AND REPAIR |
Commercial and multifamily, biggest first.
Historic District 1. MAIN PURPOSE: REPAIR A DUMP TRUCK DAMAGED BASEMENT BRICK WALL IN THE FRONT LEFT CORNER OF THE BUILDING. 2. TEMPORARY SHORING TO SUPPORT THE UPPER STRUCTURE: INSTALL A TEMPORARY SHORING STEEL FRAME IN THE BASEMENT LEVEL BEFORE THE DEMOLITION, UNTIL THE WALL REPAIR CONSTRUCTION…
Status: Completed
| Not published |
| — |