Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator, Hvac/Mechanical, Plumbing work permitted September 17, 2025, with 8 permits through October 7, 2026.
furnish and install one (1) 750lb, 20fpm, 3 stop, passenger Savaria V1504 ADA/Wheelchair lift.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
8 permits issued Sep 17 – Oct 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2602657 SHOP DRAWING · ELEVATOR - ALTERATION furnish and install one (1) 750lb, 20fpm, 3 stop, passenger Savaria V1504 ADA/Wheelchair lift. Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#E2612351 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#E2612004 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#M2604075 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#E2610641 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2608718 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2600866 CONSTRUCTION · ALTERATION AND REPAIR Proposed work consist of excavation, shoring and underpinning. Scope includes installation of a temporary SOE system consisting of drilled, uncased soldier piles at max 8' O.C., with wood lagging and one tier of rakers/corner bracing, designed from existing or final grade -approx. Elev. 197- to… Status: Permit Issued | Not published | — |
#B2303082 CONSTRUCTION · ADDITION ALTERATION REPAIR Renovation and basement addition to an existing apartment building. Renovations include replacement in kind of dwelling unit kitchens, baths and HVAC units. One dwelling unit will be renovated per UFAS requirements. New exterior ramps, stoops will be installed at entry and at rear for… Status: Permit Issued | Not published | — |