Get ProEvery project in every city · from $79/mo
Get Procommercial project · Washington DC, DC
Commercial General Building work permitted June 25, 2025.
DC Water - DCCR will Abandon One (1) Well: SAC-308 (Monitoring Well/Vibrating Wire Piezometer). The boring was 5.5" diameter and 150 ft bgs. A 1.5" monitoring well was placed from 133'-143'. The well owner did not apply for a well construction permit back in 2008 , the DCW-DCCR Project statement letter along with the well Boring log and other required documents (as built map and schematic, geotechnical profile, etc.) were submitted to DOEE as a part of the Well Completion Report. The abandonment procedure to be followed is explained in the work plan and summarized below: Tremie grout the…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Jun 25 – Jun 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SB2500146 CONSTRUCTION · MISCELLANEOUS - SOIL BORING DC Water - DCCR will Abandon One (1) Well: SAC-308 (Monitoring Well/Vibrating Wire Piezometer). The boring was 5.5" diameter and 150 ft bgs. A 1.5" monitoring well was placed from 133'-143'. The well owner did not apply for a well construction permit back in 2008 , the DCW-DCCR Project statement… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |