Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Solar work permitted March 17, 2025, with 6 permits through December 9, 2025.
Removal of rear bioretention and erosion and sediment control installations ONLY. Expansion of the upper level green roof shall be submitted under a separate application.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
6 permits issued Mar 17 – Dec 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCIV2500045 CONSTRUCTION · CIVIL PLANS Removal of rear bioretention and erosion and sediment control installations ONLY. Expansion of the upper level green roof shall be submitted under a separate application. Status: Permit Issued | Not published | — |
Commercial and multifamily, biggest first.
#E2513146 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#SOL2503141 CONSTRUCTION · SOLAR SYSTEM REVISION to SOL2501033: Changing interconnection location to panel at roof. Adding utility accessible shunt trip initiator at utility meter Status: Permit Issued | Not published | — |
#B2502169 CONSTRUCTION · ADDITION ALTERATION REPAIR Revisions to B2208696 - ***THIS IS NOT AN ADDITION** recessed front door, replacement of existing column near elevator and other plan changes shown Status: Permit Issued | Not published | — |
#SH2500011 CONSTRUCTION · SHEETING AND SHORING support of excavation to elevate foundation - supplemental bciv permit to be filed Status: Permit Issued | Not published | — |
#SOL2501033 CONSTRUCTION · SOLAR SYSTEM Installation of a 26.19 kW roof-mount PV system, consisting of 54 solar modules Status: Permit Issued | Not published | — |