Commercial General Building, Elevator work permitted February 28, 2025, with 2 permits through May 6, 2025.
Replace existign Dry Power Unit with New direct replacement power unit. New unit to have same motor HP Replace existing door equipment with new GAL door equipment New MOVFR-II Operators New Car roller guides New infrared detectors New limit switches New travel cable New microprocessor controller by Smartrise New fixtures by Innovation
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Feb 28 – May 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2501195 SHOP DRAWING · ELEVATOR - ALTERATION Replace existign Dry Power Unit with New direct replacement power unit. New unit to have same motor HP Replace existing door equipment with new GAL door equipment New MOVFR-II Operators New Car roller guides New infrared detectors New limit switches New travel cable New microprocessor controller… Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#B2501521 CONSTRUCTION · ALTERATION AND REPAIR Historic District ***INTERIOR WORK ONLY** Repair and replace the below items in the elevator machine room. Replacement of existing machine room lights & outlets. Replacement of existing ML & Cab light disconnects. Replacement of existing machine room HVAC. Replacement of existing elevator pit sump… Status: Permit Issued | Not published | — |