Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator work permitted December 18, 2025, with 3 permits through May 14, 2026.
Replace existing controller, machine, ropes and governor with new.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Dec 18 – May 14, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2601411 SHOP DRAWING · ELEVATOR - ALTERATION Replace existing controller, machine, ropes and governor with new. Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#B2601502 CONSTRUCTION · ALTERATION AND REPAIR FOR ELEVATOR REVIEW ONLY***INTERIOR WORK ONLY***REPAIR & REPLACE THE BELOW ITEMS IN THE E.M.R***Replace the elevator mainline disconnect, Replace the 110v cab light disconnect, Replace lights and GFIs in EMR and Pit, Replace the pit access ladder, Replace the machine room door. Status: Permit Issued |
| Not published |
| — |
#E2603537 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |