Get ProEvery project in every city · from $79/mo
Get Procommercial project · Washington DC, DC
Commercial General Building work permitted February 18, 2025, with 10 permits through September 4, 2025.
Erosion and sediment control measures at Amtrak's Ivy City Maintenance Yard facility (DP-0)
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
10 permits issued Feb 18 – Sep 4, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCIV2500169 CONSTRUCTION · CIVIL PLANS Erosion and sediment control measures at Amtrak's Ivy City Maintenance Yard facility (DP-0) Status: Permit Issued | Not published | — | |
#BCIV2500117 CONSTRUCTION · CIVIL PLANS Erosion and sediment control measures associated with Ivy City Maintenance Yard's OCS Foundations |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#BCIV2500061 CONSTRUCTION · CIVIL PLANS Erosion and sediment control measures for a waterline replacement at the Amtrak Ivy City Maintenance Yard - associated with DOEE plan #s23732 Status: Permit Issued | Not published | — |
#SB2500191 CONSTRUCTION · MISCELLANEOUS - SOIL BORING ECS will advanced one boring to a depth of 40 feet below ground surface with a track mounted geoprobe. The boring will be developed into a groundwater monitoring well. Status: Permit Issued | Not published | — |
#SB2500114 CONSTRUCTION · MISCELLANEOUS - SOIL BORING ECS will mobilize a track mounted geoprobe to advance 1 boirng to depth of 40 feet below ground surface. Status: Permit Issued | Not published | — |
#SB2500116 CONSTRUCTION · MISCELLANEOUS - SOIL BORING ECS Will mobilize a track-mounted geoprobe to advance two borings to a depth of 40 feet below ground surface. Additionally, one boring will be developed into a monitoring well. Status: Permit Issued | Not published | — |
#SB2500115 CONSTRUCTION · MISCELLANEOUS - SOIL BORING ECS will mobilize a track-mounted geoprobe to advance one boring to a depth of 40 feet below ground surface. Status: Permit Issued | Not published | — |
#SB2500122 CONSTRUCTION · MISCELLANEOUS - SOIL BORING ECS will mobilize a track mounted geoprobe to advance eight borings to 10 feet. One boring will be advanced to a depth of 40 feet. Additionally, two of the borings will be developed into monitoring wells. Status: Permit Issued | Not published | — |
#SB2500123 CONSTRUCTION · MISCELLANEOUS - SOIL BORING ECS will mobilize a track mounted geoprobe to advance 3 borings to a depth of 40 feet bgs. One of the borings will be developed into a permanent monitoring well. Status: Permit Issued | Not published | — |
#SB2500072 CONSTRUCTION · MISCELLANEOUS - SOIL BORING A total of thirty-six (36) boreholes are proposed to be advanced at the Ivy City Yard Maintenance Facility Project. The borings will be performed in two (2) phases and will be advanced to target depths between 20 and 90 feet below the ground surface. Phase I includes twenty-eight (28) boreholes,… Status: Permit Issued | Not published | — |