Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator, Plumbing work permitted December 5, 2025, with 5 permits through January 29, 2026.
Modernization of hydraulic elevators to include new controller, new power unit, new door operator, new fixtures, new cab doors, new cab interiors and new cab flooring
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
5 permits issued Dec 5 – Jan 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2600694 SHOP DRAWING · ELEVATOR - ALTERATION Modernization of hydraulic elevators to include new controller, new power unit, new door operator, new fixtures, new cab doors, new cab interiors and new cab flooring Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#EA2600692 SHOP DRAWING · ELEVATOR - ALTERATION Modernization of hydraulic elevators to include new controller, new power unit, new door operator, new fixtures, new cab doors, new cab interiors and new cab flooring Status: Permit Issued | Not published | — |
#P2603569 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2603087 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2600520 CONSTRUCTION · ALTERATION AND REPAIR ***FOR ELEVATOR REVIEW ONLY***INTERIOR WORK ONLY***REPAIR REPLACE THE FOLLOWING ITEMS IN THE E.M.R.***Replace the elevator mainline disconnects, Replace the cab light disconnects, Replace existing fluorescent fixtures with LED, Replace receptacles with GFI, Replace pit access ladder. Status: Permit Issued | Not published | — |