Commercial General Building, Electrical, Hvac/Mechanical, Plumbing, Solar work permitted February 25, 2025, with 10 permits through October 6, 2026.
To install 11.25 KWdc on the roof of the building.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
10 permits issued Feb 25 – Oct 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SOL2602794 CONSTRUCTION · SOLAR SYSTEM To install 11.25 KWdc on the roof of the building. Status: Permit Issued |
Commercial and multifamily, biggest first.
| — |
#M2601627 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#E2605234 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2605253 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2604155 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2601795 CONSTRUCTION · ALTERATION AND REPAIR PERMIT REVISION TO B2303669, B2501134, & B2508335 - Scope of revision limited to kitchen & bath layouts, & HVAC equipment. Original scope below: Addition/Alteration of Existing 3-story Single Family Structure to convert to 4-story Multi-family. Full MEP & Underpinning to be included. Status: Permit Issued | Not published | — |
#E2604781 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2508335 CONSTRUCTION · ALTERATION AND REPAIR PERMIT REVISION TO B2303669 - Scope of revision limited to widneing the existing party wall foundation in-lieu of underpinning. Original scope below: Addition/Alteration of Existing 3-story Single Family Structure to convert to 4-story Multi-family. Full MEP & Underpinning to be included. Status: Permit Issued | Not published | — |
#P2510226 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2501134 CONSTRUCTION · ADDITION ALTERATION REPAIR PERMIT REVISION TO B2303669 - Scope of revision limited to changes to the size of the penthouse and interior layouts of the dwelling units on the 4th floor and penthouse. Minor adjustments to the elevator core. Minor MEP as associated with the scope listed. Status: Permit Issued | Not published | — |