Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator work permitted July 10, 2025, with 4 permits through April 7, 2026.
Supply and install a pneumatic vacuum elevator, The Cube 36", 3 stop
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Jul 10 – Apr 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EN2601089 SHOP DRAWING · ELEVATOR - NEW Supply and install a pneumatic vacuum elevator, The Cube 36", 3 stop Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#B2601024 CONSTRUCTION · ALTERATION AND REPAIR HISTORIC Revision Application(B2506632) - The elevator location was slightly shifted due to existing framing encountered at the start of framing work. Updated plans are reflected on sheets S1, S2, S3, and S4. Status: Permit Issued |
| Not published |
| — |
#E2511083 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2506632 CONSTRUCTION · ALTERATION AND REPAIR In the Dupont Circle Historic District Modify 2 floor platforms to install 3 stop Cube 36 elevator Status: Permit Issued | Not published | — |