Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator, Plumbing work permitted January 8, 2025, with 13 permits through August 13, 2026.
Commission of Fine Arts jurisdiction area INTERIOR WORK ONLY, REPAIR & REPLACE THE FOLLOWING ITEMS IN THE E.M.R.***Replace Mainline Disconnect, Replace Cab Light Disconnect, Replace light fixtures with LED, Replace HVAC in EMR, Replace EMR Door, Replace pit ladder, Sump Pump
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
13 permits issued Jan 8 – Aug 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2611902 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published |
Commercial and multifamily, biggest first.
| — |
#B2606195 CONSTRUCTION · ALTERATION AND REPAIR CFA AT DESIGNATED ROOF SECTIONS, REMOVE AND DISCARD: EXISTING MODIFIED BITUMEN (OR OTHER MEMBRANE), ASSOCIATED FLASHINGS AND INSULATION DOWN TO THE SURFACE OF THE EXISTING WOOD DECK. REFASTEN EXISTING WOOD DECKING, INSTALL: 3" THICK BASE LAYER OF FLAT POLYISOCYANURATE INSULATION, MECHANICALLY… Status: Permit Issued | Not published | — |
#P2608335 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2510119 CONSTRUCTION · ALTERATION AND REPAIR Commission of Fine Arts jurisdiction area HE RIVER PARK MUTUAL HOMES IS A HOUSING COOPERATIVE COMMUNITY CONSISTING OF APARTMENTS AND TOWNHOUSES LOCATED ON AN 11 ACRE SITE, CONSTRUCTED CIRCA 1962. AS SUCH, THE FACILITY IS APPROXIMATELY 60 YEARS OLD AT THIS TIME. THE FACILITY CONSISTS OF TWO (2)… Status: Permit Issued | Not published | — |
#P2603407 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#ER2600513 SHOP DRAWING · ELEVATOR - REPAIR Repair/ replace equipment Elevator 3 & 4 replacing controller, new Hollister Whitney machines, installing new cab interior, hall buttons, cop, and hall position indicator at main landing. New govenor, rope gripper, ELSCO roller guides and new safety edge. Status: Permit Issued | Not published | — |
#P2602476 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#EA2501860 SHOP DRAWING · ELEVATOR - ALTERATION Repair/ replace equipment Elevator 1 & 2 replacing controller, new Hollister Whitney machines, installing new cab interior, hall buttons, cop, and hall position indicator at main landing. New govenor, rope gripper, ELSCO roller guides and new safety edge. Status: Permit Issued | Not published | — |
#B2505465 CONSTRUCTION · ALTERATION AND REPAIR Commission of Fine Arts jurisdiction area Replacing the roof Status: Completed | Not published | — |
#B2504199 CONSTRUCTION · ALTERATION AND REPAIR THE WORK INCLUDES REPLACEMENT OF SEVERAL EXISTING BALCONIES INCLUDING EXISTING FRAMING AT THE TOWNHOMES AND OTHER WORK IN THE CONTRACT DOCUMENTS. THE EXISTING BALCONY FRAMING SHALL BE REPLACED WITH STRUCTURAL ALUMINUM FRAMING, WHICH SHALL SUPPORT GALVANIZED STEEL COMPOSITE DECKING, CAST-IN-PLACE… Status: Completed | Not published | — |
#B2503284 CONSTRUCTION · ALTERATION AND REPAIR Commission of Fine Arts jurisdiction area INTERIOR WORK ONLY, REPAIR & REPLACE THE FOLLOWING ITEMS IN THE E.M.R.***Replace Mainline Disconnect, Replace Cab Light Disconnect, Replace light fixtures with LED, Replace HVAC in EMR, Replace EMR Door, Replace pit ladder, Sump Pump Status: Permit Issued | Not published | — |
#E2505917 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#PP2501376 POST CARD · PLUMBING Status: Permit Issued | Not published | — |