Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DCNew: first permit Oct 28
Multifamily General Building work permitted October 28, 2026.
Replacement of three vertical dual temperature risers serving two fan coil units. Replacement of vertical condensate drain risers that are parallel to each dual temperature riser. Installation of thirty two riser isolation valves for the supply and return risers and installation of sixteen riser balancing valves. Like in kind replacement, connect to existing fixtures. Includes fire stopping at each riser floor pipe chase of our piping penetrations only. Installation of pipe supports and one generic brass bodied air vent at the top of each new riser set. Installation of hose end boiler drains…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Oct 28 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2607349 CONSTRUCTION · ADDITION ALTERATION REPAIR Replacement of three vertical dual temperature risers serving two fan coil units. Replacement of vertical condensate drain risers that are parallel to each dual temperature riser. Installation of thirty two riser isolation valves for the supply and return risers and installation of sixteen riser… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |