Get Procommercial project · Washington DC, DC
Commercial General Building, Electrical, Elevator, Hvac/Mechanical, Plumbing, Sign work permitted May 16, 2025, with 29 permits through October 15, 2026.
THE SCOPE OF WORK IS A TENANT FIT OUT OF SPEC SUITES ON THE PARTIAL 9TH FLOOR OF 1250 EYE STREET NW, TO INCLUDE SELECTIVE DEMOLITION, CONSTRUCTION OF NEW PARTITIONS, CEILINGS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING AS INDICATED ON THE DRAWINGS.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
29 permits issued May 16 – Oct 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2608115 |
Commercial and multifamily, biggest first.
CONSTRUCTION · ALTERATION AND REPAIR
THE SCOPE OF WORK IS A TENANT FIT OUT OF SPEC SUITES ON THE PARTIAL 9TH FLOOR OF 1250 EYE STREET NW, TO INCLUDE SELECTIVE DEMOLITION, CONSTRUCTION OF NEW PARTITIONS, CEILINGS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING AS INDICATED ON THE DRAWINGS.
Status: Permit Issued
| Not published |
| — |
#P2608205 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#SG2600163 CONSTRUCTION · SIGN Installation of one 6'-5 7/8"x2'-0 7/16" illuminated Channel Numeral Sign to be mechanically fastened and bottom-mounted to existing stainless structure. Final hook up to existing circuit only. Status: Permit Issued | Not published | — |
#P2604696 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2605612 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2600706 CONSTRUCTION · ALTERATION AND REPAIR ALTERATION AND REPAIR WORK ON FLOOR LEVEL 6 TO REMOVE VACANT TENANT IMPROVEMENTS AND RETURN SPACES TO EMPTY AREAS FOR FUTURE TENANTS. WORK INCLUDES SELECTIVE NONSTRUCTURAL DEMOLITION OF INTERIOR PARTITIONS, CEILING, FIXTURES, BRANCH CIRCUIT OF ELECTRICAL AND FIRE ALARM SYSTEMS AND FINISHES. NEW… Status: Permit Issued | Not published | — |
#EN2600713 SHOP DRAWING · ELEVATOR - NEW Installation of new commercial elevator. Status: Permit Issued | Not published | — |
#B2600545 CONSTRUCTION · ALTERATION AND REPAIR Revision to issued permit B2500891. The main project scope of work entails amenity space renovation on the partial lower levels, 1st, 2nd and 12th floor of the property Status: Permit Issued | Not published | — |
#E2602695 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2601356 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2600195 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2508378 CONSTRUCTION · ALTERATION AND REPAIR Revision to issued permit B2500891 affecting the 12th floor LAN room and structural rework on level 02, 12 and roof. Status: Permit Issued | Not published | — |
#P2600107 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#E2600052 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2514248 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#B2508084 CONSTRUCTION · ALTERATION AND REPAIR FOLLOWING ARE THE PLANS OUTLINING THE SCOPE OF WORK REQUIRED FOR TENANT FIT OUT OF SPEC SUITES ON THE PARTIAL 3RD FLOOR OF 1250 I (EYE) STREET NW, TO INCLUDE SELECTIVE DEMOLITION, CONSTRUCTION OF NEW PARTITIONS, CEILINGS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING AS INDICATED. THE DRAWINGS, IN… Status: Completed | Not published | — |
#P2511709 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#M2505298 SUPPLEMENTAL · MECHANICAL Status: Completed | Not published | — |
#E2513980 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2513934 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2511549 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2507720 CONSTRUCTION · ALTERATION AND REPAIR TENANT BUILD OUT TO INCLUDE PRIVATE OFFICES, MEETING SPACE, CAF?, SHOWER ROOM, RESTROOM, AND SUPPORT SPACES. MEP SCOPE AS REQUIRED TO SUPPORT NEW DESIGN. NO CHANGE IN USE GROUP. NO STRUCTURAL. Status: Completed | Not published | — |
#E2512540 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2511872 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Completed | Not published | — |
#P2509129 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#M2503165 SUPPLEMENTAL · MECHANICAL Status: Completed | Not published | — |
#P2507475 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2500891 CONSTRUCTION · ALTERATION AND REPAIR AMENITY RENOVATION ON THE PARTIAL 1ST, 2ND AND 12TH FLOOR OF 1250 I (EYE) STREET NW, TO INCLUDE SELECTIVE DEMOLITION, CONSTRUCTION OF NEW PARTITIONS, CEILINGS, FINISHES, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AS INDICATED. EXISTING EGRESS STRATEGY ON THE 1ST FLOOR TO REMAIN UNCHANGED.… Status: Completed | Not published | — |
#E2508803 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |