Get ProEvery project in every city · from $79/mo
Get Procommercial project · Washington DC, DC
Commercial General Building, Electrical, Elevator, Plumbing work permitted February 6, 2025, with 29 permits through March 12, 2026.
THIS PROJECT INVOLVES A NON-STRUCTURAL LEVEL TWO ALTERATION TO AN EXISTING OFFICE SPACE INCLUDING BUT NOT LIMITED TO NEW PARTITIONS, LIGHTING, FINISHES, ELECTRICAL, MECHANICAL WORK. 7TH and 3RD FLOOR
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
29 permits issued Feb 6 – Mar 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2606467 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
Commercial and multifamily, biggest first.
#E2606294 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2604753 SUPPLEMENTAL · PLUMBING AND GAS Plumbing trade Permit Status: Permit Issued | Not published | — |
#P2605230 SUPPLEMENTAL · PLUMBING AND GAS Plumbing trade Permit Status: Permit Issued | Not published | — |
#P2604960 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2601606 CONSTRUCTION · ALTERATION AND REPAIR RENOVATION OF 2ND GENERATION COMMERCIAL INTERIOR OFFICE SPACE. WORK TO INCLUDE DEMOLTION OF EXISTING OFFICE SPACE AND CONSTRUCTION OF NEW PARTITIONS, FINISHES, LIGHTING, ELECTRICAL, MECHANICAL, AND PLUMBING - SUITE 1000 Status: Completed | Not published | — |
#B2601756 CONSTRUCTION · ALTERATION AND REPAIR Repairs to concrete support columns for cooling tower, support cooling tower and repair 2 of 4 columns which support cooling tower. Approx 20sf of concrete column repair needed. Remove and replace steel dunnage and walkway grating and rails. Status: Permit Issued | Not published | — |
#E2605603 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2604524 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2601605 CONSTRUCTION · ALTERATION AND REPAIR RENOVATION OF 2ND GENERATION COMMERCIAL INTERIOR OFFICE SPACE. WORK TO INCLUDE DEMOLTION OF EXISTING OFFICE SPACE AND CONSTRUCTION OF NEW PARTITIONS, FINISHES, LIGHTING, ELECTRICAL, MECHANICAL, AND PLUMBING. SUITE 1010. NO STRUCTURE - FASTRACT Status: Permit Issued | Not published | — |
#P2511623 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#EA2502282 SHOP DRAWING · ELEVATOR - ALTERATION Modification of elevator to include fabrication and install of new microprocessor, VVVF drive motors, closed loop door operation and operating fixtures. Status: Permit Issued | Not published | — |
#EA2502285 SHOP DRAWING · ELEVATOR - ALTERATION Modification of elevator to include fabrication and install of new microprocessor, VVVF drive motors, closed loop door operation and operating fixtures. Status: Permit Issued | Not published | — |
#E2511730 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2509497 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2506008 CONSTRUCTION · ALTERATION AND REPAIR 7TH FLOOR: THIS PROJECT INVOLVES A NON-STRUCTURAL LEVEL TWO ALTERATION TO AN EXISTING OFFICE SPACE INCLUDING BUT NOT LIMITED TO NEW LIGHTING, FINISHES, ELECTRICAL AND MECHANICAL WORK. Status: Completed | Not published | — |
#EA2502284 SHOP DRAWING · ELEVATOR - ALTERATION Modification of elevator to include fabrication and install of new microprocessor, VVVF drive motors, closed loop door operation and operating fixtures. Status: Permit Issued | Not published | — |
#EA2502283 SHOP DRAWING · ELEVATOR - ALTERATION Modification of elevator to include fabrication and install of new microprocessor, VVVF drive motors, closed loop door operation and operating fixtures. Status: Permit Issued | Not published | — |
#E2510403 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2506225 CONSTRUCTION · ALTERATION AND REPAIR FOR ELEVATOR REVIEW ONLY***INTERIOR WORK ONLY***REPAIR & REPLACE THE BELOW ITEMS IN THE E.M.R***Replace (4) elevator mainline disconnects, Add (4) 110v cab light disconnects, Replace lights and GFIs in EMR and (4) Pits, Add GFI's in EMR, Replace pit access ladders (x4). Status: Permit Issued | Not published | — |
#B2503697 CONSTRUCTION · ALTERATION AND REPAIR FURNISH A CENTIMARK 60 MIL, EPDM ROOFING MEMBRANE ON ROOF SECTION 1 & 2. FURNISH AND INSTALL CENTIMARK 60 MIL REINFORCED, TPO MEMBRANE ON ROOF SECTION 3. Status: Permit Issued | Not published | — |
#P2505853 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#E2506513 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2506247 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2504560 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2501012 CONSTRUCTION · ALTERATION AND REPAIR THIS PROJECT INVOLVES A NON-STRUCTURAL LEVEL TWO ALTERATION TO AN EXISTING OFFICE SPACE INCLUDING BUT NOT LIMITED TO NEW PARTITIONS, LIGHTING, FINISHES, ELECTRICAL, FIRE PROTECTION, MECHANICAL AND PLUMBING WORK - Suite 701. Status: Completed | Not published | — |
#E2505417 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2503911 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2501227 CONSTRUCTION · ALTERATION AND REPAIR THIS PROJECT INVOLVES A NON-STRUCTURAL LEVEL TWO ALTERATION TO AN EXISTING OFFICE SPACE INCLUDING BUT NOT LIMITED TO NEW PARTITIONS, LIGHTING, FINISHES, ELECTRICAL, MECHANICAL WORK. 7TH and 3RD FLOOR Status: Completed | Not published | — |