Commercial General Building work permitted January 29, 2025, with 4 permits through July 24, 2026.
Construction of a temporary crossover lane from 395 SB to 395 SB HOV and construction of a staging area adjacent to 395/WMATA bridge pier
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Jan 29 – Jul 24, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCIV2600078 CONSTRUCTION · CIVIL PLANS Construction of a temporary crossover lane from 395 SB to 395 SB HOV and construction of a staging area adjacent to 395/WMATA bridge pier Status: Permit Issued | Not published | — | |
#BCIV2600047 CONSTRUCTION · CIVIL PLANS |
Commercial and multifamily, biggest first.
CFA / H Long Bridge North (LBN) - Package MD4: Yard 7 includes establishing a contractor laydown area for the construction of the trestle across the Washington Channel, and to support the construction needs of the temporary and permanent pedestrian bridges in addition to the Maine Avenue CSX…
Status: Permit Issued
| Not published |
| — |
#BCIV2600046 CONSTRUCTION · CIVIL PLANS CFA / H Long Bridge North (LBN ) - Package MD6: Yard 1 & Yard 2 includes establishing two contractor laydown yards: Yard 1 on NPS Lot C and Yard 2 on NPS Lot B adjacent to I-395. Work activities include installing a driveway entrance for Yard 1, boundary fencing for both yards, and a temporary… Status: Permit Issued | Not published | — |
#BCIV2400156 CONSTRUCTION · CIVIL PLANS **FEDERAL EWP#3 DOEE #7757 The Virginia Passenger Rail Authority is proposing to design additional bridges and tracks to support two new train lines across the Potomac river. The plan includes roadway geometry changes, traffic safety updates, Stormwater management facilities, and other elements in… Status: Permit Issued | Not published | — |