Multifamily General Building, Electrical, Plumbing work permitted September 30, 2025, with 3 permits through October 31, 2025.
Revision to prior permit to provide as-built conditions per Inspectors Request. FOR ISSUED PERMIT B1806997 FLOOR PLAN REVSION INCLUDES: Floor Plan revision to remove the 1/2 bath bath from each unit, room name change from Bedroom to Den and change bathroom door location to allow hallway access
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Sep 30 – Oct 31, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#P2601071 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — | |
Commercial and multifamily, biggest first.
#E2601191 SUPPLEMENTAL · ELECTRICAL Status: Completed |
| Not published |
| — |
#B2409891 CONSTRUCTION · ALTERATION AND REPAIR Revision to prior permit to provide as-built conditions per Inspectors Request. FOR ISSUED PERMIT B1806997 FLOOR PLAN REVSION INCLUDES: Floor Plan revision to remove the 1/2 bath bath from each unit, room name change from Bedroom to Den and change bathroom door location to allow hallway access Status: Completed | Not published | — |