Commercial General Building work permitted April 10, 2025, with 3 permits through March 5, 2026.
CFA / H ***Federal Project*** THIS PROJECT WILL BE CONSTRUCTED ON A PREMISES OWNED BY THE UNITED STATES OF AMERICA AT THE U.S. CAPITOL COMPLEX. THE PURPOSE OF THIS PROJECT IS TO INSTALL LINEAR UTILITY INFRASTRUCTURE AND REPLACE DIRECTLY AFFECTED HARDSCAPES AS NEEDED TO RESTORE THE SITE TO MATCH EXISTING CONDITIONS.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Apr 10 – Mar 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCIV2600054 CONSTRUCTION · CIVIL PLANS CFA / H ***Federal Project*** THIS PROJECT WILL BE CONSTRUCTED ON A PREMISES OWNED BY THE UNITED STATES OF AMERICA AT THE U.S. CAPITOL COMPLEX. THE PURPOSE OF THIS PROJECT IS TO INSTALL LINEAR UTILITY INFRASTRUCTURE AND REPLACE DIRECTLY AFFECTED HARDSCAPES AS NEEDED TO RESTORE THE SITE TO MATCH… Status: Permit Issued | Not published | — |
Commercial and multifamily, biggest first.
#SB2500205 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Geotechnical Soil Boring Status: Permit Issued | Not published | — |
#BCIV2500052 CONSTRUCTION · CIVIL PLANS ***FEDERAL THE PROPOSED WORK AT THE NATIONAL GARDEN BOTANICAL GARDEN WILL BE LIMITED TO AREAS WITHIN THE REGIONAL GARDEN AND TERRACE GARDEN. WORK IN THE REGIONAL GARDEN INCLUDES REPLACING THE EXISTING PEA GRAVEL AND BLUE COBBLE STONE CURBS WITHIN THE SPECIFIED WALKWAYS WITH STANDARD CONCRETE… Status: Permit Issued | Not published | — |