Commercial General Building, Electrical, Elevator work permitted May 14, 2025, with 3 permits through June 3, 2025.
Elevator Modernization of traction elevators 1-2 including new microprocessor based control system, hoist machine, rope gripper, hoist ropes w/wedge shackles, door equipment, governor and tail sheave, deflector sheave, hall & car fixtures, and cab interiors
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued May 14 – Jun 3, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2501862 SHOP DRAWING · ELEVATOR - ALTERATION Elevator Modernization of traction elevators 1-2 including new microprocessor based control system, hoist machine, rope gripper, hoist ropes w/wedge shackles, door equipment, governor and tail sheave, deflector sheave, hall & car fixtures, and cab interiors Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#E2508735 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2504210 CONSTRUCTION · ALTERATION AND REPAIR Commission of Fine Arts jurisdiction area FOR ELEVATOR REVIEW ONLY***INTERIOR WORK ONLY***REPAIR & REPLACE THE BELOW ITEMS IN THE E.M.R***Replace the elevator mainline disconnects, Replace the 110v cab light disconnects, Replace lights and GFIs in EMR and Pit. Status: Permit Issued | Not published | — |