Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building work permitted October 8, 2025, with 3 permits through June 1, 2026.
DGS Project. Replace existing chiller, remote condensing unit, and boiler with new heat pump chiller. Install new underground piping.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Oct 8 – Jun 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2604131 CONSTRUCTION · ALTERATION AND REPAIR DGS Project. Replace existing chiller, remote condensing unit, and boiler with new heat pump chiller. Install new underground piping. Status: Permit Issued | Not published | — | |
#BCIV2600072 CONSTRUCTION · CIVIL PLANS |
Commercial and multifamily, biggest first.
Existing asphalt pavement to be milled and overlayed. Asphalt pavement to be very slightly widened and elongated to provide two full size basketball courts as an add alternate. Install padding to light poles in the base scope and relocate them as an add alternate. New basketball hoops and a new…
Status: Permit Issued
| Not published |
| — |
#B2508260 CONSTRUCTION · ALTERATION AND REPAIR ADA Upgrades at Bald Eagle Recreation Center- Concrete ramp modification, restrooms renovation. Status: Permit Issued | Not published | — |