Commercial General Building, Sign work permitted December 12, 2024, with 36 permits through September 16, 2026, declaring $7,576,727 of work. Contractor on record: C C I Commercial Construction & Improv.
12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes.
San Francisco permit records name C C I Commercial Construction & Improv, Field Construction Inc. and Tri-Signal Integration Inc. as the contractors on this project, among 13 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
36 permits issued Dec 12 – Sep 16, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Aug 10 | #202608106308 otc alterations permit 12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes. Status: Issued | Field Construction Inc. | $1.5M |
| applied Aug 10 | #202608106311 otc alterations permit 11/f suites 1100, 1120, 1150: tenant improvements include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. mep deferred. suite 1100 - 58 occupants suite 1120 - 20 occupants suite 1150 - 57 occupants Status: Issued | Field Construction Inc. | $1.2M |
| applied Sep 10 | #202609107927 otc alterations permit 4 evacuation maps on 17th floor Status: Complete | Prima Acquire Inc Dba Lahue And Associat | $1.9K |
| applied Jul 6 | #202607064583 otc alterations permit construction revision to 202605060831: add 4 additoinal phone booths for a total of 11. Status: Complete | C C I Commercial Construction & Improv | $20K |
| applied May 6 | #202605060831 otc alterations permit 4/f: installation of (7) phone booths x 13sf = 91 sf. Status: Complete | C C I Commercial Construction & Improv | $40K |
| applied May 28 | #202605282080 otc alterations permit ste 1700: mep for 250 california permit: 202604028807 - 17th floor Status: Complete | C C I Commercial Construction & Improv | $130K |
| applied Apr 27 | #202604270182 otc alterations permit 18th floor (n) gypsum ceiling in the conference room including new light fixtures. Status: Complete | C C I Commercial Construction & Improv | $90K |
| applied Apr 2 | #202604028807 otc alterations permit suite 1700: demolition of ceiling, scope includes construction of ceiling power and finishes. fire alarm system, fire sprinklers deferred. Status: Complete | C C I Commercial Construction & Improv | $300K |
| applied Feb 26 | #202602266559 otc alterations permit 15th fl - 4 evacuation signs Status: Complete | Prima Acquire Inc Dba Lahue And Associat | $1.9K |
| applied Feb 9 | #202602095518 otc alterations permit 21/fl- install (n) and relocate (e) notification devices due to ti 202511149598. all devices appliances and equipment are (e) unless noted Status: Issued | Tri-Signal Integration Inc. | $6.4K |
| applied Feb 11 | #202602115693 otc alterations permit as-builts for f/a 202512020678: replaced 24 semi recessed sprinklers with concealed sprinkles. convert 31 uprights to pendant. relocate 8 concealded spirnklers, 12 upright and 3 pendants sprinklres to accomdate new build out. Status: Complete | Pioneer Fire Inc. | $6K |
| applied Jan 8 | #202601083432 otc alterations permit install new devices and appliances due to tenant improvement. all devices appliances and equipment are existing unless otherwide noted as new or relocation to new location ref 2025-09-11-5093 Status: Complete | Tri-Signal Integration Inc. | $68.4K |
| applied Jan 27 | #202601274632 otc alterations permit 15/f: office tenant retrofit. light fixtures and associated circuiting, controls, power and signal. ref permit 202509115093 Status: Complete | C C I Commercial Construction & Improv | $150K |
| applied Jan 27 | #202601274585 otc alterations permit 15th fl deferred mechanical modifications for pa 2025-0911-5093 Status: Complete | C C I Commercial Construction & Improv | $250K |
| applied Jan 15 | #202601153921 otc alterations permit revision to pa # 202509115093: change of layout to suite 1500, 1550, 1560. Status: Complete | C C I Commercial Construction & Improv | — |
| applied Jan 7 | #202601073354 otc alterations permit 21st floor-fire sprinkler t.i. relocate 3 heads. add 1 head. total 4 ref #202511149598 Status: Issued | Anderson, Rowe & Buckley, Inc. | $2.5K |
| applied Dec 11 | #202512111487 otc alterations permit ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency. Status: Complete | San Francisco Commercial Builders Inc | $6K |
| applied Nov 14 | #202511149598 otc alterations permit 21st fl - minor renovation of non-load bearing interior partitions and ceilings w/in 800 sf. a limited number of non-load bearing interior partitions, ceilings and finishes will be added. new furnishings will be provided within the limited affected areas. no change to building use, egress or Status: Complete | Dpr Construction A | $190K |
| applied Dec 19 | #202512192251 otc alterations permit 14th floor. installation if new lighting and controls on the 14th floor in suite 1400. Status: Issued | Mc Millan Electric | $68K |
| applied Dec 2 | #202512020678 otc alterations permit 15th fl suite 1500, 1550 & 1560 ref pa # 2025-0911-5093: relocate 16 uprights, 8 pendents, convert 32 uprights to pendents Status: Complete | Pioneer Fire Inc. | $14K |
| applied Nov 25 | #202511250409 sign - erect non electric sign: limoncella Status: Complete | Golden Gate Sign Company Inc. | $5K |
| applied Sep 11 | #202509115093 otc alterations permit 15th fl: construction of non-load bearing partitions, doors, glazing and frames, new ceiling tile & grid, new light fixtures, and new finishes. Status: Complete | C C I Commercial Construction & Improv | $1.5M |
| applied Aug 12 | #202508122816 otc alterations permit 14/f- deferred mep submittal for bpa# 202506249354. Status: Complete | Field Construction Inc. | $130K |
| applied Aug 26 | #202508263897 otc alterations permit 14th fl ref pa #2025-0513-6314: relocate existing and install new devices and appliances due to tenant improvements Status: Issued | Tri-Signal Integration Inc. | $27.6K |
| applied Aug 26 | #202508263863 otc alterations permit suite 1400: install new devices and appliances due to tenant improvements. fire alarm devices. Status: Issued | Tri-Signal Integration Inc. | $5K |
| applied Aug 8 | #202508082622 otc alterations permit fire sprinkler permit. relocate 1 , delete 1 sprinkler on th 14th floor . ti 202506249354 Status: Complete | R L H Fire Protection Inc | $1K |
| applied Aug 8 | #202508082623 otc alterations permit 14/f. fire sprinkler: relocate 27, add 7 , delete 5 sprinklers on the 14th fl 202505136314 Status: Complete | R L H Fire Protection Inc | $22K |
| applied May 13 | #202505136314 otc alterations permit 14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishes Status: Complete | Field Construction Inc. | $478K |
| applied Jun 24 | #202506249354 otc alterations permit 14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred. Status: Complete | Field Construction Inc. | $60K |
| applied Nov 19 | #202411195246 otc alterations permit 23rd fl- ref pa # 2024-1108-4657 disconnect fire alarm safety connections of (e) generator on roof & reconnect to a (n) generator Status: Issued | Tri-Signal Integration Inc. | $9K |
| applied Jan 9 | #202411084657 additions alterations or repairs 23/f: installation of a new emergency generator. the scope inlcudes installation of (n) generator, connection of em generator to building systems w/related mechanical,electrical & structural tie-down to (e) mechanical pad. Status: Complete | Swinerton Builders | $287K |
| applied Apr 9 | #202504093998 otc alterations permit rev to pa# 2025-0213-0266: as builts for remving 1 smoke and relabeled 3 devices 77, 74, 73 per field inspector Status: Issued | Tri-Signal Integration Inc. | — |
| applied Feb 13 | #202502130266 otc alterations permit 19th fl: reference to pa # 2024-1211-6571 remodel floor layout relocate (e) & install (n) devices & appliances for ti Status: Issued | Tri-Signal Integration Inc. | $12.9K |
| applied Jan 15 | #202501158341 otc alterations permit 19/f: add (6), relocate (16) fire sprinkler per t.i. ref permit 202412116571 Status: Complete | Ayoob & Peery Plumbing Co Inc | $13.7K |
| applied Jan 15 | #202501158371 otc alterations permit 19th floor:mech: replace existing pneumatic vav controllers with ddc controller. low pressure duct work for new layout. new vav boxes with reheat coils. new exhaust fans. new piping to new vav coils. electrical: lighting fixtures and associated controls, power & signal devices and wiring. Status: Complete | Field Construction Inc. | $264K |
| applied Dec 11 | #202412116571 otc alterations permit 19th fl- ti involves modification of (e) tenant suite to include selective demo & construction of non load bearing partitions, new & relocated light fixtures, new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices. Status: Complete | Field Construction Inc. | $838K |