Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted July 11, 2025, with 7 permits through August 20, 2026, declaring $1,589,328 of work. Contractor on record: PKJ Construction.
Proposed TI on an (E) commercial 2-story building. The scope of work to include interior uplift of an existing cold shell within the first and second floor of 975 waterfront place, block 4a. Portions of the existing facade and patios to be removed. The building is part of the IQHQ research and design district development. The proposed use is a (N) restaurant to include dining rooms, bars, restrooms, commercial kitchen, and elevator. A shared trash room is provided by the landlord. Floor area and parking are to remain.
San Diego permit records name PKJ Construction, Hedrick Fire Protection and Siemens San Diego as the contractors on this project, among 4 contractors in all.
7 permits issued Jul 11 – Aug 20, newest first.
In San Diego, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 5 | #PMT-3431719 Approval - Construction - Fire Pmt - Kitchen Hood Deferred Kitchen Hood Suppression system with plans for PRJ-1125962, associated with PMT-3325138. Status: Issued | Hedrick Fire Protection | — |
| applied Mar 23 | #PMT-3407759 Approval - Construction - Fire Pmt - Alarm Deferred Fire Alarms with Plans. BLDG 4A. PRJ-1125962 Status: Inspection Followup | Siemens San Diego | — |
| applied Dec 15 | #PMT-3391558 Approval - Construction - Fire Pmt - Suppression Deferred Fire Sprinklers with Plans. PRJ-1125962 Status: Inspection Followup | Cosco Fire Protection | — |
| applied Nov 26 | #PMT-3325139 Electrical Pmt For Electrical works associated with a proposed TI on an (E) commercial 2-story building. The scope of work to include interior uplift of an existing cold shell within the first and second floor of 975 waterfront place, block 4a. Portions of the existing facade and patios to be removed. The… Status: Inspection Followup | PKJ Construction | — |
| applied Nov 26 | #PMT-3325138 Building Permit Proposed TI on an (E) commercial 2-story building. The scope of work to include interior uplift of an existing cold shell within the first and second floor of 975 waterfront place, block 4a. Portions of the existing facade and patios to be removed. The building is part of the IQHQ research and… Status: Inspection Followup | PKJ Construction | $1.6M |
| applied Nov 26 | #PMT-3325140 Mechanical Pmt For mechanical works associated with a proposed TI on an (E) commercial 2-story building. The scope of work to include interior uplift of an existing cold shell within the first and second floor of 975 waterfront place, block 4a. Portions of the existing facade and patios to be removed. The… Status: Inspection Followup | PKJ Construction | — |
| applied Nov 26 | #PMT-3325141 Plumbing Pmt For Plumbing works associated with a proposed TI on an (E) commercial 2-story building. The scope of work to include interior uplift of an existing cold shell within the first and second floor of 975 waterfront place, block 4a. Portions of the existing facade and patios to be removed. The building… Status: Inspection Followup | PKJ Construction | — |