Commercial Fire Protection work permitted November 27, 2024, with 2 permits through December 2, 2024. Contractor on record: Wesley Brown.
KEARNY MESA: Building Permit for the proposed Interior remodeling/demolition on (E) office space on the third floor. The scope of work includes the interior demolition only and the space will be vacant after. Walls, doors, millwork, ceiling tile, lighting, Electrical outlets and flooring are to be demolished. No structural work to be performed under this Permit. A certificate of occupancy will not be Issued for the shell portion of the building. TI permit will be applied later.
San Diego permit records name Wesley Brown and Low Voltage Integrated Systems as the contractors on this project.
2 permits issued Nov 27 – Dec 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Nov 4 | #PMT-3321090 Approval - Construction - Fire Pmt - Suppression |
In San Diego, biggest first.
KEARNY MESA: Building Permit for the proposed Interior remodeling/demolition on (E) office space on the third floor. The scope of work includes the interior demolition only and the space will be vacant after. Walls, doors, millwork, ceiling tile, lighting, Electrical outlets and flooring are to be…
Status: Closed
| Wesley Brown |
| — |
| applied Nov 12 | #PMT-3322389 Approval - Construction - Fire Pmt - Alarm KEARNY MESA: Building Permit for the proposed Interior remodeling/demolition on (E) office space on the third floor. The scope of work includes the interior demolition only and the space will be vacant after. Walls, doors, millwork, ceiling tile, lighting, Electrical outlets and flooring are to be… Status: Closed | Low Voltage Integrated Systems | — |