Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Diego, CA
Multifamily General Building, Electrical, Hvac/Mechanical, Plumbing work permitted January 31, 2025, with 4 permits through January 31, 2025, declaring $5,616 of work. Contractor on record: Bill Wang.
For a proposed conversion of the 1/2 bathroom into a full bathroom on the first floor and conversion of a walk-in closet into a full bathroom on a second floor to the existing townhouse.
San Diego permit records name Bill Wang as the contractor on this project.
4 permits issued Jan 31 – Jan 31, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 3 | #PMT-3305710 Building Permit For a proposed conversion of the 1/2 bathroom into a full bathroom on the first floor and conversion of a walk-in closet into a full bathroom on a second floor to the existing townhouse. |
Status: Closed
| Bill Wang |
| $5.6K |
| applied Dec 5 | #PMT-3326584 Mechanical Pmt Mechanical Permit for a proposed conversion of the 1/2 bathroom into a full bathroom on the first floor and conversion of a walk-in closet into a full bathroom on a second floor to the existing townhouse. Status: Closed | Bill Wang | — |
| applied Dec 5 | #PMT-3326585 Plumbing Pmt Plumbing Permit for a proposed conversion of the 1/2 bathroom into a full bathroom on the first floor and conversion of a walk-in closet into a full bathroom on a second floor to the existing townhouse. Status: Closed | Bill Wang | — |
| applied Dec 5 | #PMT-3326583 Electrical Pmt Electrical Permit for a proposed conversion of the 1/2 bathroom into a full bathroom on the first floor and conversion of a walk-in closet into a full bathroom on a second floor to the existing townhouse. Status: Closed | Bill Wang | — |