Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted April 6, 2026, with 4 permits through April 7, 2026, declaring $410,800 of work. Contractor on record: Davis & Adams Construction, Inc..
For the proposed tenant improvement to an existing one story building (suites 111&112). "change of use, existing Dental office to altus Schools AUDEO that will serve grades 6 to 12" Work includes the demolition of existing non-bearing walls, suspended ceiling, light fixtures, and restroom plumbing fixtures; construction of new non-bearing partitions, new suspended ceiling, and interior finishes; installation of new restroom plumbing fixtures, sinks, and an ADA accessible bottle filler with new water and waste lines; redistribution of existing HVAC supply/return air with new diffusers,…
San Diego permit records name Davis & Adams Construction, Inc. as the contractor on this project.
4 permits issued Apr 6 – Apr 7, newest first.
| Issued | Permit | Contractor | Value |
|---|
In San Diego, biggest first.
| applied Sep 10 | #PMT-3374534 Plumbing Pmt Plumbing work associated with the proposed interior tenant improvement to an existing one story office/dental (suites 111&112). Status: Closed | Davis & Adams Construction, Inc. | — |
| applied Sep 10 | #PMT-3374533 Mechanical Pmt Mechanical work associated with the proposed interior tenant improvement to an existing one story office/dental (suites 111&112). Status: Closed | Davis & Adams Construction, Inc. | — |
| applied Sep 10 | #PMT-3374532 Electrical Pmt Electrical work associated with the proposed interior tenant improvement to an existing one story office/dental (suites 111&112). Status: Closed | Davis & Adams Construction, Inc. | — |
| applied Sep 10 | #PMT-3374531 Building Permit For the proposed tenant improvement to an existing one story building (suites 111&112). "change of use, existing Dental office to altus Schools AUDEO that will serve grades 6 to 12" Work includes the demolition of existing non-bearing walls, suspended ceiling, light fixtures, and restroom plumbing… Status: Issued | Davis & Adams Construction, Inc. | $411K |