Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Hvac/Mechanical work permitted June 18, 2026, with 6 permits through June 18, 2026, declaring $80,000 of work. Contractor on record: RAM Construction.
For Building 3 - replacement of (4) rooftop air handler units, switch of main source of heating hot water from rooftop central gas boiler system to backup system & installation of (N) heat pumps inside rooftop air handlers (main source of heating & cooling will be provided by heat pump system).
San Diego permit records name RAM Construction as the contractor on this project.
6 permits issued Jun 18 – Jun 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 24 | #PMT-3393418 Electrical Pmt For electrical work related to rooftop work associated with (E) 4-story office building (Building 3). |
In San Diego, biggest first.
Status: Issued
| RAM Construction |
| — |
| applied Dec 24 | #PMT-3393419 Mechanical Pmt For mechanical work related to rooftop work associated with (E) 4-story office building (Building 3). Status: Issued | RAM Construction | — |
| applied Dec 24 | #PMT-3393411 Mechanical Pmt For mechanical work related to rooftop work associated with (E) 4-story office building (Building 2). Status: Issued | RAM Construction | — |
| applied Dec 24 | #PMT-3393414 Building Permit For Building 3 - replacement of (4) rooftop air handler units, switch of main source of heating hot water from rooftop central gas boiler system to backup system & installation of (N) heat pumps inside rooftop air handlers (main source of heating & cooling will be provided by heat pump system). Status: Issued | RAM Construction | $80K |
| applied Dec 24 | #PMT-3393410 Electrical Pmt For electrical work related to rooftop work associated with (E) 4-story office building (Building 2). Status: Issued | RAM Construction | — |
| applied Dec 24 | #PMT-3393405 Building Permit For Building 2 - replacement of (4) rooftop air handler units, switch of main source of heating hot water from rooftop central gas boiler system to backup system & installation of (N) heat pumps inside rooftop air handlers (main source of heating & cooling will be provided by heat pump system). Status: Issued | RAM Construction | $80K |