Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Diego, CA
Multifamily General Building, Electrical, Hvac/Mechanical, Plumbing work permitted February 6, 2025, with 4 permits through February 6, 2025, declaring $65,624 of work. Contractor on record: San diego best remodel.
**SCOPE CHANGE 08/27/2024** t for the conversion of existing level 1 bedroom suite into (1) Bonus ADU to an existing duplex. Work to include the existing interior stairwell from the primary dwelling unit to be removed and converted to closet space. Historic cleared per PRJ-1113296 related project for an ADU on the second floor.
San Diego permit records name San diego best remodel as the contractor on this project.
4 permits issued Feb 6 – Feb 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 27 | #PMT-3309634 |
Building Permit
**SCOPE CHANGE 08/27/2024** t for the conversion of existing level 1 bedroom suite into (1) Bonus ADU to an existing duplex. Work to include the existing interior stairwell from the primary dwelling unit to be removed and converted to closet space. Historic cleared per PRJ-1113296 related project…
Status: Closed
| San diego best remodel |
| $65.6K |
| applied Aug 27 | #PMT-3309637 Plumbing Pmt For plumbing permit associated with the conversion of existing level 1 bedroom suite into (1) Bonus ADU to an existing duplex. Status: Closed | San diego best remodel | — |
| applied Aug 27 | #PMT-3309635 Electrical Pmt For electrical permit associated with the conversion of existing level 1 bedroom suite into (1) Bonus ADU to an existing duplex. Status: Closed | San diego best remodel | — |
| applied Aug 27 | #PMT-3309636 Mechanical Pmt For mechanical permit associated with the conversion of existing level 1 bedroom suite into (1) Bonus ADU to an existing duplex. Status: Closed | San diego best remodel | — |