Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical, Hvac/Mechanical work permitted August 17, 2026, with 2 permits through August 17, 2026. Contractor on record: Mesa Energy Systems, inc.
For the proposed installation of one (1) 2-ton split system, a one (1) new 2-ton condenser unit on the roof and install two (2) fan coil units for an existing commercial building.
San Diego permit records name Mesa Energy Systems, inc as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Aug 17 – Aug 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 22 | #PMT-3423067 Mechanical Pmt For the proposed installation of one (1) 2-ton split system, a one (1) new 2-ton condenser unit on the roof and install two (2) fan coil units for an existing commercial building. |
In San Diego, biggest first.
Status: Inspection Followup
| Mesa Energy Systems, inc |
| — |
| applied Jul 1 | #PMT-3424872 Electrical Pmt For new fused disconnects and feeders from the existing branch sub-panel for an existing commercial building. Status: Inspection Followup | Mesa Energy Systems, inc | — |