Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted January 12, 2025, with 4 permits through March 14, 2025, declaring $364,000 of work. Contractor on record: azar bouhaniche.
Proposed Interior tenant improvement on an (E) commercial building. The work to include (N) non load bearing partition walls for the new/ revised dressing rooms. (N) finishes and fixtures. Work to include structural detailing for the millwork seismic connections. Minor electrical for adjusted lighting. Electrical equipment shall remain. Minor HVAC work for the new dressing room layout, ductwork only. The existing equipment shall remain. There is no plumbing work. There is no expansion and no change of use.
San Diego permit records name azar bouhaniche and Johnson Controls Fire Protection as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Jan 12 – Mar 14, newest first.
In San Diego, biggest first.
| Issued |
|---|
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
| applied Feb 24 | #PMT-3339295 Approval - Construction - Fire Pmt - Suppression Deferred Fire Sprinklers Affidavit. 1-20 Sprinklers. Ste. 244. PRJ-1124687 Status: Closed | Johnson Controls Fire Protection | — |
| applied Oct 16 | #PMT-3318032 Building Permit Proposed Interior tenant improvement on an (E) commercial building. The work to include (N) non load bearing partition walls for the new/ revised dressing rooms. (N) finishes and fixtures. Work to include structural detailing for the millwork seismic connections. Minor electrical for adjusted… Status: Closed | azar bouhaniche | $364K |
| applied Oct 16 | #PMT-3318033 Electrical Pmt For electrical works associated with a proposed Interior tenant improvement on an (E) commercial building. The work to include (N) non load bearing partition walls for the new/ revised dressing rooms. (N) finishes and fixtures. Work to include structural detailing for the millwork seismic… Status: Closed | azar bouhaniche | — |
| applied Oct 16 | #PMT-3318034 Mechanical Pmt For mechanical works associated with a proposed Interior tenant improvement on an (E) commercial building. The work to include (N) non load bearing partition walls for the new/ revised dressing rooms. (N) finishes and fixtures. Work to include structural detailing for the millwork seismic… Status: Closed | azar bouhaniche | — |