Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Plumbing work permitted April 30, 2026, with 3 permits through April 30, 2026, declaring $1,800,000 of work. Contractor on record: Fernando Navarrete.
For proposed wastewater treatment upgrade to (E) commercial building. The work includes dissolved air flotation, filter press for dewatering, utility trenching, site cleanup, asphalt restoration, concrete pads, excavation & grading for equipment foundations.
San Diego permit records name Fernando Navarrete as the contractor on this project.
3 permits issued Apr 30 – Apr 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 25 | #PMT-3371369 Electrical Pmt For electrical works associated with a proposed wastewater treatment upgrade to an (E) commercial building. The work includes dissolved air flotation, filter press for dewatering, utility trenching, site cleanup, asphalt restoration, concrete pads, excavation and grading for equipment foundations. |
Status: Closed
| Fernando Navarrete |
| — |
| applied Aug 25 | #PMT-3371366 Building Permit For proposed wastewater treatment upgrade to (E) commercial building. The work includes dissolved air flotation, filter press for dewatering, utility trenching, site cleanup, asphalt restoration, concrete pads, excavation & grading for equipment foundations. Status: Inspection Followup | Fernando Navarrete | $1.8M |
| applied Aug 25 | #PMT-3371371 Plumbing Pmt For plumbing works associated with a proposed wastewater treatment upgrade to an (E) commercial building. The work includes dissolved air flotation, filter press for dewatering, utility trenching, site cleanup, asphalt restoration, concrete pads, excavation and grading for equipment foundations. Status: Closed | Fernando Navarrete | — |