Commercial Electrical work permitted April 18, 2025. Contractor on record: Baker Electric.
Electrical Permit for the proposed installation of a new 211.14 KWDC, 150KWAC, 195.181KWAC-CEC, ballasted rooftop PV solar system and associated equipment to an existing commercial building. Work to include install of Sunny Tripower free-standing inverter. Prior Discretionary: PTS-31079, PTS-133441, PTS-179347,PTS-412987.Discretionary: PTS-31079, PTS-133441, PTS-179347,PTS-412987.
San Diego permit records name Baker Electric as the contractor on this project.
1 permit issued Apr 18 – Apr 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 12 | #PMT-3327770 Electrical Pmt Electrical Permit for the proposed installation of a new 211.14 KWDC, 150KWAC, 195.181KWAC-CEC, ballasted rooftop PV solar system and associated equipment to an existing commercial building. Work to include install of Sunny Tripower free-standing inverter. Prior Discretionary: PTS-31079,… |
In San Diego, biggest first.
Status: Closed
| Baker Electric |
| — |