Get Procommercial project · San Diego, CA
Commercial Plumbing work permitted April 11, 2025, with 5 permits through July 21, 2026. Contractor on record: Gilberto Tagle.
REMOVE & REPLACE EXISTING DOMESTIC HOT WATER SYSTEMS AT 6470 El Cajon Blvd. We will be performing the following tasks as part of the replacement: 1. Removal and replacement of 1 existing water heater with 1 instantaneous water heater. The installation will utilize the existing piping in the 1 existing boiler room. Please note that there will be no change to the boiler room location. 2. Install one dedicated duplex receptacle for the new water heater for basic operation. The water heater draws approximately 2 amps, resulting in minimal additional electrical load.
San Diego permit records name Gilberto Tagle and American Power Solutions as the contractors on this project.
5 permits issued Apr 11 – Jul 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 21 | #PMT-3428972 |
In San Diego, biggest first.
No-Plan - Nonresidential/Multifamily - Plumbing
REMOVE & REPLACE EXISTING DOMESTIC HOT WATER SYSTEMS AT 6470 El Cajon Blvd. We will be performing the following tasks as part of the replacement: 1. Removal and replacement of 1 existing water heater with 1 instantaneous water heater. The installation will utilize the existing piping in the 1…
Status: Inspection Followup
| American Power Solutions |
| — |
| applied Jun 4 | #PMT-3357129 No-Plan - Nonresidential/Multifamily - Plumbing Building 10 Outside By Unit 121 Replacement of a 50 Gallon WH Status: Closed | Gilberto Tagle | — |
| applied Apr 16 | #PMT-3348599 No-Plan - Nonresidential/Multifamily - Plumbing BLDG.#3 UNIT.#211 50 Gallon Water Heater Replacement Power Vent WH Status: Issued | Gilberto Tagle | — |
| applied Apr 11 | #PMT-3347845 No-Plan - Nonresidential/Multifamily - Plumbing Building 8 Unit 230 Power vent 50-gallon WH. Replacement Status: Closed | Gilberto Tagle | — |
| applied Apr 11 | #PMT-3347838 No-Plan - Nonresidential/Multifamily - Plumbing Building 4 Unit 109 50 Gallon WH Replacement Status: Closed | Gilberto Tagle | — |