Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Diego, CA
Multifamily Plumbing work permitted April 2, 2026.
ENCANTO NEIGHBORHOODS: Public Right-of-way permit for the proposed 2” water meter, 2” copper water service, backflow preventer and wet tap (only). Work includes proposed trench resurfacing and removing and replacing the existing sidewalk, tunnel under the curb and gutter and existing for an Apartment building
San Diego’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Apr 2 – Apr 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Nov 20 | #AGR-0005166 Approval - Process - Agreement ENCANTO NEIGHBORHOODS: Public Right-of-way permit for the proposed 2” water meter, 2” copper water service, backflow preventer and wet tap (only). Work includes proposed trench resurfacing and removing and replacing the existing sidewalk, tunnel under the curb and gutter and existing for an… Status: Issued | Not published |
| — |