Commercial General Building, Electrical, Fire Protection, Plumbing work permitted September 10, 2026, with 4 permits through September 24, 2026, declaring $18,801 of work. Contractor on record: DPR Construction.
For site improvements to include: new exterior pre-fabricated hazmat shed at grade, and exterior emergency shower, replace existing chain-link gate with new, new concrete pad for the installation of exterior emergency shower, associated improvements and modifications to structural, plumbing, and electrical as required for new work.
San Diego permit records name DPR Construction as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Sep 10 – Sep 24, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 18 |
In San Diego, biggest first.
#PMT-3443780 Approval - Construction - Fire Pmt - Alarm Deferred Fire Alarm Affidavit. 1-4 Initiating Devices and/or 1-10 Notification Appliances. PRJ-1159859, PMT-3426750 Status: Issued |
| Not published |
| — |
| applied Jul 9 | #PMT-3426750 Building Permit For site improvements to include: new exterior pre-fabricated hazmat shed at grade, and exterior emergency shower, replace existing chain-link gate with new, new concrete pad for the installation of exterior emergency shower, associated improvements and modifications to structural, plumbing, and… Status: Issued | DPR Construction | $18.8K |
| applied Jul 9 | #PMT-3426756 Electrical Pmt Associated electrical work for site improvements to include: new exterior pre-fabricated hazmat shed at grade, and exterior emergency shower, replace existing chain-link gate with new, new concrete pad for the installation of exterior emergency shower, associated improvements and modifications to… Status: Inspection Followup | DPR Construction | — |
| applied Jul 9 | #PMT-3426758 Plumbing Pmt Associated plumbing work for site improvements to include: new exterior pre-fabricated hazmat shed at grade, and exterior emergency shower, replace existing chain-link gate with new, new concrete pad for the installation of exterior emergency shower, associated improvements and modifications to… Status: Inspection Followup | DPR Construction | — |