Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Plumbing work permitted August 29, 2025, with 3 permits through August 29, 2025, declaring $27,768 of work. Contractor on record: Baker Electric & Renewables LLC.
For USD Campus pump room. Work to include construction of a new pump room in the existing parking structure on the 2nd level, to enclose pump and piping for the fire sprinkler system. OR-1-1
San Diego permit records name Baker Electric & Renewables LLC as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
3 permits issued Aug 29 – Aug 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 18 | #PMT-3359579 Building Permit For USD Campus pump room. Work to include construction of a new pump room in the existing parking structure on the 2nd level, to enclose pump and piping for the fire sprinkler system. OR-1-1 |
In San Diego, biggest first.
Status: Closed
| Baker Electric & Renewables LLC |
| $27.8K |
| applied Jul 28 | #PMT-3366425 Plumbing Pmt new floor drain in the pump room Status: Closed | Baker Electric & Renewables LLC | — |
| applied Jun 18 | #PMT-3359586 Electrical Pmt For the electrical work associated with the construction of a new pump room in the existing parking structure on the 2nd level, to enclose pump and piping for the fire sprinkler system. Status: Closed | Baker Electric & Renewables LLC | — |