Commercial Sign work permitted April 7, 2025. Contractor on record: Russell Warner.
For Change copy on temporary welcome banners for the 2025 Asian Pacific American Heritage month in May, followed by Mira Mesa Street Fair along Mira Mesa Blvd in August 2025 and change copy to the local community design after the Street Fair. One size 30"x94". Banners per SDMC 142.1210(b) (60) banners on Public Property and in Public Right of way.
San Diego permit records name Russell Warner as the contractor on this project.
1 permit issued Apr 7 – Apr 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 27 | #PMT-3345329 Approval - Construction - Sign Pmt For Change copy on temporary welcome banners for the 2025 Asian Pacific American Heritage month in May, followed by Mira Mesa Street Fair along Mira Mesa Blvd in August 2025 and change copy to the local community design after the Street Fair. One size 30"x94". Banners per SDMC 142.1210(b) (60)… |
In San Diego, biggest first.
Status: Issued
| Russell Warner |
| — |