Commercial Electrical, Solar work permitted November 14, 2025, with 2 permits through December 5, 2025. Contractor on record: gerald schoelen.
Installation of an energy storage system in conjunction with existing PV system. Proposed PV: 22 modules @ 400 W (8.80 kW); Inverter: (1) EG4 FlexBOSS18 (240); Battery: (1) EG4 Wallmount All Weather Battery WM-48-280-1-AW (14.3 kWh). Existing PV noted: ET Solar Industry ET-P660245BB x11 and Sunny Boy 2500HF?US x1.
San Diego permit records name gerald schoelen as the contractor on this project.
2 permits issued Nov 14 – Dec 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 5 | #PMT-3390083 Photovoltaic - SB 379 Installation of an energy storage system in conjunction with existing PV system. Proposed PV: 22 modules @ 400 W (8.80 kW); Inverter: (1) EG4 FlexBOSS18 (240); Battery: (1) EG4 Wallmount All Weather Battery WM-48-280-1-AW (14.3 kWh). Existing PV noted: ET Solar Industry ET-P660245BB x11 and Sunny… |
Status: Closed
| Gerald Schoelen |
| — |
| applied Nov 14 | #PMT-3386634 No-Plan - Nonresidential/Multifamily - Electrical Service disconnect (meter) and reconnect with sdge that requires re-inspection. No changes to service or panel. I had to choose one item below to proceed - fyi. Status: Closed | gerald schoelen | — |