Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted April 29, 2026, with 6 permits through August 18, 2026, declaring $254,488 of work. Contractor on record: Lockrul Construction.
For the proposed interior TI on an existing 11-story commercial building. work to include (N) interior in 4th floor non-load bearing partitions and (N) finishes. Associated with duct proposed, site utilities, and plumbing work ( water closet and urinals).
San Diego permit records name Lockrul Construction, Hiller and Nova Security as the contractors on this project.
6 permits issued Apr 29 – Aug 18, newest first.
| Issued | Permit |
|---|
In San Diego, biggest first.
| Contractor |
|---|
| Value |
|---|
| applied Jun 3 | #PMT-3419926 Approval - Construction - Fire Pmt - Suppression Deferred Fire Sprinklers with Plans. PRJ-1152510, PMT-3403366 Status: Inspection Followup | Hiller | — |
| applied May 1 | #PMT-3414632 Approval - Construction - Fire Pmt - Alarm Deferred Fire Alarm Affidavit. 1-4 Initiating Devices and/or 1-10 Notification Appliances. Suite 460. PRJ-1152510-PMT-3403366. Status: Inspection Followup | Nova Security | — |
| applied Feb 25 | #PMT-3403367 Electrical Pmt For electrical work associated with the proposed interior TI on an existing 11-story commercial building. Work to include (N) interior in 4th floor non-load bearing partitions and (N) finishes. Status: Closed | Lockrul Construction | — |
| applied Feb 25 | #PMT-3403366 Building Permit For the proposed interior TI on an existing 11-story commercial building. work to include (N) interior in 4th floor non-load bearing partitions and (N) finishes. Associated with duct proposed, site utilities, and plumbing work ( water closet and urinals). Status: Inspection Followup | Lockrul Construction | $254K |
| applied Feb 25 | #PMT-3403369 Plumbing Pmt For plumbing work associated with the proposed interior TI on an existing 11-story commercial building. Work to include (N) interior in 4th floor non-load bearing partitions and (N) finishes. Status: Closed | Lockrul Construction | — |
| applied Feb 25 | #PMT-3403368 Mechanical Pmt For mechanical work associated with the proposed interior TI on an existing 11-story commercial building. Work to include (N) interior in 4th floor non-load bearing partitions and (N) finishes. Status: Closed | Lockrul Construction | — |