Multifamily General Building, Plumbing work permitted September 16, 2025, with 8 permits through September 16, 2025, declaring $48,125 of work. Contractor on record: Cuesta Construction.
For proposed interior remodel to an existing (3)-story MDU. Work to include repair and restoration of existing 1-hour rated walls adjacent to bathroom showers, including the replacement of the shower drains and repairs to the 1-hour rated floor/ceiling assemblies. The proposed repairs shall be based on the engineering judgement- documents provided to the city by GHD, the fire protection consultant for this project.
San Diego permit records name Cuesta Construction as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued Sep 16 – Sep 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied May 30 | #PMT-3356315 Building Permit |
In San Diego, biggest first.
For proposed interior remodel to an existing (3)-story MDU. Work to include repair and restoration of existing 1-hour rated walls adjacent to bathroom showers, including the replacement of the shower drains and repairs to the 1-hour rated floor/ceiling assemblies. The proposed repairs shall be…
Status: Closed
| Cuesta Construction |
| $13.8K |
| applied May 30 | #PMT-3356311 Building Permit For proposed interior remodel to an existing (3)-story MDU. Work to include repair and restoration of existing 1-hour rated walls adjacent to bathroom showers, including the replacement of the shower drains and repairs to the 1-hour rated floor/ceiling assemblies. The proposed repairs shall be… Status: Closed | Cuesta Construction | $6.9K |
| applied May 29 | #PMT-3356180 Building Permit For proposed interior remodel to an existing (3)-story MDU. Work to include repair and restoration of existing 1-hour rated walls adjacent to bathroom showers, including the replacement of the shower drains and repairs to the 1-hour rated floor/ceiling assemblies. The proposed repairs shall be… Status: Closed | Cuesta Construction | $6.9K |
| applied Sep 5 | #PMT-3373706 Plumbing Pmt For associated plumbing work for the proposed remodeling for an (E) (3)-story MDU. Status: Closed | Cuesta Construction | — |
| applied May 30 | #PMT-3356313 Building Permit For proposed interior remodel to an existing (3)-story MDU. Work to include repair and restoration of existing 1-hour rated walls adjacent to bathroom showers, including the replacement of the shower drains and repairs to the 1-hour rated floor/ceiling assemblies. The proposed repairs shall be… Status: Closed | Cuesta Construction | $27.5K |
| applied May 29 | #PMT-3356190 Plumbing Pmt For associated plumbing work for the proposed remodeling for an (E) (3)-story MDU. Status: Closed | Cuesta Construction | — |
| applied Sep 5 | #PMT-3373703 Plumbing Pmt For associated plumbing work for the proposed remodeling for an (E) (3)-story MDU. Status: Closed | Cuesta Construction | — |
| applied Sep 5 | #PMT-3373705 Plumbing Pmt For associated plumbing work for the proposed remodeling for an (E) (3)-story MDU. Status: Closed | Cuesta Construction | — |