Commercial Electrical work permitted July 21, 2026. Contractor on record: Sustineo Construction.
Installation of a new (621.60) KW DC ballasted Solar Photovoltaic system on a flat roof of an existing commercial building.
San Diego permit records name Sustineo Construction as the contractor on this project.
1 permit issued Jul 21 – Jul 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 13 | #PMT-3401512 Electrical Pmt Installation of a new (621.60) KW DC ballasted Solar Photovoltaic system on a flat roof of an existing commercial building. Status: Inspection Followup | Sustineo Construction | — |