Commercial Electrical, Solar work permitted September 2, 2025, with 2 permits through December 15, 2025. Contractor on record: Del Sur Energy Group Inc.
Install 3.645 kW rooftop photovoltaic system with 5 kWh battery storage
San Diego permit records name Del Sur Energy Group Inc and Interwest Electric as the contractors on this project.
2 permits issued Sep 2 – Dec 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 11 | #PMT-3391134 Photovoltaic - SB 379 Install 3.645 kW rooftop photovoltaic system with 5 kWh battery storage Status: Closed | Del Sur Energy Group Inc |
In San Diego, biggest first.
| — |
| applied Sep 2 | #PMT-3372822 No-Plan - Nonresidential/Multifamily - Electrical Disconnect/Reconnect Panel Upgrade Status: Issued | Interwest Electric | — |