Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical work permitted September 23, 2026. Contractor on record: Matt Trout.
Install (4) V4 Level 3 post-mounted EV Chargers in the parking lot of an existing hotel building. Work to include (1) pad-mounted V3.5 Level 3 supercharger cabinet, (1) transformer with foundation, (1) 800 Amp switchboard, and (2) light poles.
San Diego permit records name Matt Trout as the contractor on this project.
1 permit issued Sep 23 – Sep 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 21 | #PMT-3412478 Electrical Pmt Install (4) V4 Level 3 post-mounted EV Chargers in the parking lot of an existing hotel building. Work to include (1) pad-mounted V3.5 Level 3 supercharger cabinet, (1) transformer with foundation, (1) 800 Amp switchboard, and (2) light poles. Status: Inspection Followup | Matt Trout |
In San Diego, biggest first.
| — |