Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Diego, CA
Multifamily General Building, Electrical, Plumbing work permitted March 11, 2026, with 3 permits through March 11, 2026. Contractor on record: Patrick Kaemerle.
Electrical work associated with a proposed remodel to an existing apartment #9, with the following work to be performed: Remodel of (1) existing kitchen and (1) existing bathroom. No changes to structural elements, wall framing or exterior walls with proposed Electrical works.
San Diego permit records name Patrick Kaemerle as the contractor on this project.
3 permits issued Mar 11 – Mar 11, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 11 | #PMT-3405616 Electrical Pmt Electrical work associated with a proposed remodel to an existing apartment #9, with the following work to be performed: Remodel of (1) existing kitchen and (1) existing bathroom. No changes to structural elements, wall framing or exterior walls with proposed Electrical works. |
Status: Issued
| Patrick Kaemerle |
| — |
| applied Mar 11 | #PMT-3405614 Building Permit For a proposed remodel to an existing apartment #9, with the following work to be performed: Remodel of (1) existing kitchen and (1) existing bathroom. No changes to structural elements, wall framing or exterior walls with proposed Electrical and Plumbing works. Status: Issued | Patrick Kaemerle | — |
| applied Mar 11 | #PMT-3405617 Plumbing Pmt Plumbing work associated with a proposed remodel to an existing apartment #9, with the following work to be performed: Remodel of (1) existing kitchen and (1) existing bathroom. No changes to structural elements, wall framing or exterior walls with Plumbing works. Status: Issued | Patrick Kaemerle | — |