Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted May 29, 2026, with 4 permits through May 29, 2026, declaring $48,720 of work. Contractor on record: Josh Coit.
For building shell of future tenant on the first floor in the Wells Fargo Plaza Building of the existing 24-story commercial building suite 150. Scope of work includes proposed demolition of non-bearing walls, new interior non-load bearing walls, new hook-ups from the existing water line to future kitchen and bar areas, a new grease interceptor in the basement, and finishes, along with associated MEP work.
San Diego permit records name Josh Coit as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued May 29 – May 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#PMT-3405161 Plumbing Pmt Associated plumbing work for the interior tenant improvement on the first floor of an existing 24-story commercial building. Suite 150. Work include for new hook-ups from the existing water line to future kitchen and bar areas and proposed sewer line. Status: Issued |
| Josh Coit |
| — |
| applied Mar 9 | #PMT-3405157 Building Permit For building shell of future tenant on the first floor in the Wells Fargo Plaza Building of the existing 24-story commercial building suite 150. Scope of work includes proposed demolition of non-bearing walls, new interior non-load bearing walls, new hook-ups from the existing water line to future… Status: Issued | Josh Coit | $48.7K |
| applied Mar 9 | #PMT-3405160 Mechanical Pmt Associated mechanical work for the interior tenant improvement on the first floor of an existing 24-story commercial building. Suite 150. Work include for a new grease interceptor in the basement. Status: Issued | Josh Coit | — |
| applied Mar 9 | #PMT-3405159 Electrical Pmt Associated electrical work for the interior tenant improvement on the first floor of an existing 24-story commercial building. Suite 150. Work include for existing light fixture and acoustical ceiling to be demolished. Status: Issued | Josh Coit | — |