Get Promultifamily project · San Diego, CA
Multifamily General Building, Electrical, Hvac/Mechanical work permitted June 25, 2026, with 3 permits through June 25, 2026, declaring $100,000 of work. Contractor on record: Ron Dibelka.
For replacement of (E) roof-mounted fluid cooler serving condenser water system at (E) 4-story office building. Scope of work includes installation of (N) cooling tower, pumps & air separator on roof, along with associated piping, power connections & controls required for operation. Structural work includes anchorage & support for (N) equipment.
San Diego permit records name Ron Dibelka as the contractor on this project.
3 permits issued Jun 25 – Jun 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 19 | #PMT-3407199 Mechanical Pmt Mechanical work associated with the proposed replacement of an existing roof-mounted fluid cooler serving the condenser water system at an existing 4-story office building. |
In San Diego, biggest first.
Status: Issued
| Ron Dibelka |
| — |
| applied Mar 19 | #PMT-3407196 Building Permit For replacement of (E) roof-mounted fluid cooler serving condenser water system at (E) 4-story office building. Scope of work includes installation of (N) cooling tower, pumps & air separator on roof, along with associated piping, power connections & controls required for operation. Structural… Status: Issued | Ron Dibelka | $100K |
| applied Mar 19 | #PMT-3407198 Electrical Pmt Electrical work associated with the proposed replacement of an existing roof-mounted fluid cooler serving the condenser water system at an existing 4-story office building. Status: Issued | Ron Dibelka | — |