Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Solar work permitted April 16, 2026. Contractor on record: LGCY Electric.
(N) 18- QCELLS Q.PEAK DUO BLK ML-G10+ 405/TS (405W) (N) 18- SOLAREDGE: U650-1GM4MRMU (N) 1- SOLAREDGE: USE11400H-USMNBE78 INVERTER (N) 1 - 60A NON-FUSED AC DISCONNECT EATON DG222URB (N) 1 - SOLAREDGE SOLAREDGE ENERGY BANK (NON-BACKUP) UBAT-10K1PS0B-03 (E) 400A MAIN BREAKER ENCLOSURE WITH (E) 200A MAIN BREAKER (E) 200A MAIN SERVICE PANEL WITH (E) 200A MAIN BREAKER
San Diego permit records name LGCY Electric as the contractor on this project.
1 permit issued Apr 16 – Apr 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 16 | #PMT-3411855 Photovoltaic - SB 379 (N) 18- QCELLS Q.PEAK DUO BLK ML-G10+ 405/TS (405W) (N) 18- SOLAREDGE: U650-1GM4MRMU (N) 1- SOLAREDGE: USE11400H-USMNBE78 INVERTER (N) 1 - 60A NON-FUSED AC DISCONNECT EATON DG222URB (N) 1 - SOLAREDGE SOLAREDGE ENERGY BANK (NON-BACKUP) UBAT-10K1PS0B-03 (E) 400A MAIN BREAKER ENCLOSURE WITH (E) 200A… Status: Closed |
In San Diego, biggest first.
| LGCY Electric |
| — |