Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted May 20, 2026, with 5 permits through October 15, 2026, declaring $654,160 of work. Contractor on record: KZ Miller Construction.
Proposed TI on an (E) commercial building. The scope includes the complete suite vacation of an existing telecommunications equipment facility. Vacation includes the removal of all switch and transmission equipment from the premises, and all associated ancillary support equipment, including but not limited to rooftop mechanical equipment, all computer room air conditioning equipment, all clean agent fire extinguishing systems, and site generator and hydrogen fuel tank. All telecommunications equipment shall be identified for salvage where appropriate and/or proper disposal at approved…
San Diego permit records name KZ Miller Construction as the contractor on this project.
5 permits issued May 20 – Oct 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In San Diego, biggest first.
| applied Sep 23 |
#PMT-3444757 Approval - Construction - Fire Pmt - Suppression Deferred Fire Sprinkler – Tenant Impr. to Existing Non-Residential/MDU with Plans. PRJ-1120749 PMT-3316878. Status: Inspection Followup |
| Not published |
| — |
| applied Sep 11 | #PMT-3442559 Approval - Construction - Fire Pmt - Alarm Deferred Fire Alarms with Plans. PRJ-1120749, PMT-3316878 Status: Issued | Not published | — |
| applied Oct 9 | #PMT-3316878 Building Permit Proposed TI on an (E) commercial building. The scope includes the complete suite vacation of an existing telecommunications equipment facility. Vacation includes the removal of all switch and transmission equipment from the premises, and all associated ancillary support equipment, including but… Status: Inspection Followup | KZ Miller Construction | $654K |
| applied Oct 9 | #PMT-3316880 Mechanical Pmt For mechanical works associated with a proposed TI on an (E) commercial building. The scope includes the complete suite vacation of an existing telecommunications equipment facility. Vacation includes the removal of all switch and transmission equipment from the premises, and all associated… Status: Inspection Followup | KZ Miller Construction | — |
| applied Oct 9 | #PMT-3316879 Electrical Pmt For electrical works associated with a proposed TI on an (E) commercial building. The scope includes the complete suite vacation of an existing telecommunications equipment facility. Vacation includes the removal of all switch and transmission equipment from the premises, and all associated… Status: Inspection Followup | KZ Miller Construction | — |