Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical work permitted May 13, 2026, with 13 permits through July 17, 2026. Contractor on record: enrique Villasenor.
Remove the existing electrical panel and replace it with a new panelboard of like kind, size, and ampacity. Reconnect all existing branch circuits to the new panel, provide proper grounding and bonding, identify all circuits, and test the completed installation for proper operation. No changes to the existing service size, branch circuit layout, or connected electrical load are included. All work shall comply with the current California Electrical Code and the requirements of the Authority Having Jurisdiction.
San Diego permit records name enrique Villasenor, Fuller Electric Corporation and SJ Electric Co as the contractors on this project, among 7 contractors in all.
13 permits issued May 13 – Jul 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In San Diego, biggest first.
#PMT-3428294 No-Plan - Nonresidential/Multifamily - Electrical Remove the existing electrical panel and replace it with a new panelboard of like kind, size, and ampacity. Reconnect all existing branch circuits to the new panel, provide proper grounding and bonding, identify all circuits, and test the completed installation for proper operation. No changes to… Status: Closed |
| SJ Electric Co |
| — |
| applied Jul 8 | #PMT-3425749 No-Plan - Nonresidential/Multifamily - Electrical Replace existing Zinsco Panel Status: Closed | Fuller Electric Corporation | — |
| applied Jul 1 | #PMT-3424894 No-Plan - Nonresidential/Multifamily - Electrical remove old 100A zinsco electrical panel out the closet Status: Closed | enrique Villasenor | — |
| applied Jun 24 | #PMT-3423580 No-Plan - Nonresidential/Multifamily - Electrical Replace Existing Panel Status: Closed | Fuller Electric Corporation | — |
| applied Jun 22 | #PMT-3422987 No-Plan - Nonresidential/Multifamily - Electrical replace existing 100A panel. Status: Closed | enrique Villasenor | — |
| applied May 26 | #PMT-3418419 No-Plan - Nonresidential/Multifamily - Electrical Upgrade old Zinsco subpanel to the same location at entryway. Status: Closed | Anson Electric LLC | — |
| applied Jun 4 | #PMT-3420238 No-Plan - Nonresidential/Multifamily - Electrical replace zinsco 100A panel for insurance purposes.in unit 207 Status: Closed | enrique Villasenor | — |
| applied Jun 4 | #PMT-3420248 No-Plan - Nonresidential/Multifamily - Electrical replace 100A zinsco panel for insurance purposes.in unit 306 Status: Closed | enrique Villasenor | — |
| applied Jun 4 | #PMT-3420236 No-Plan - Nonresidential/Multifamily - Electrical replace 100A zinsco panel for insurance purposes. Status: Closed | enrique Villasenor | — |
| applied May 27 | #PMT-3418699 No-Plan - Nonresidential/Multifamily - Electrical Sub Panel update for unit #304. 100 amp panel. Status: Closed | CET Electric | — |
| applied May 27 | #PMT-3418872 No-Plan - Nonresidential/Multifamily - Electrical Sub panel upgrade Status: Closed | Frank Electric Inc. | — |
| applied May 13 | #PMT-3416597 No-Plan - Nonresidential/Multifamily - Electrical Replacing Existing Panel Status: Closed | Fuller Electric Corporation | — |
| applied May 13 | #PMT-3416628 No-Plan - Nonresidential/Multifamily - Electrical Remove and replace electrical panel, like for like, rotaded 180 degrees Status: Closed | Nick North | — |